Comtech-ef-data MIDAS Site Preparation Requirements Uživatelský manuál Strana 16

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 30
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 15
Site Preparation Requirements, Operator’s Guide, Rev.2
Indoor Equipment 2-2
M
M
o
o
d
d
e
e
m
m
a
a
n
n
d
d
N
N
e
e
t
t
w
w
o
o
r
r
k
k
S
S
e
e
r
r
v
v
e
e
r
r
L
L
o
o
c
c
a
a
t
t
i
i
o
o
n
n
The modem and network server equipment is installed into a customer
provided standard 19-inch (48.26 cm) equipment rack which has a minimum
depth of 30.75 inches (78.1 cm). The equipment rack shall provide adequate
ventilation to disperse the heat generated by the equipment and secured to the
floor as required by ITU-T Recommendation K.27, Internaltional
Telecommunication Union Publication.
The required Rack Unit (RU) for the Comtech EF Data provided equipment is
detailed in the applicable Product Data Sheet.
In addition to providing floor space for the equipment rack, a minimum of 3
feet (91.44 cm) is required in the front and in the rear of the rack to access the
equipment.
I
I
n
n
d
d
o
o
o
o
r
r
R
R
e
e
q
q
u
u
i
i
r
r
e
e
m
m
e
e
n
n
t
t
s
s
I
I
n
n
d
d
o
o
o
o
r
r
E
E
q
q
u
u
i
i
p
p
m
m
e
e
n
n
t
t
E
E
n
n
v
v
i
i
r
r
o
o
n
n
m
m
e
e
n
n
t
t
a
a
l
l
C
C
o
o
n
n
d
d
i
i
t
t
i
i
o
o
n
n
s
s
The location of the indoor equipment must provide temperature and humidity
controls and filtered air flow for the removal of dust particles.
Power dissipation, temperature, and humidity specifications for the Comtech
EF Data furnished equipment are referenced in the applicable Product Data
Sheet.
Zobrazit stránku 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 29 30

Komentáře k této Příručce

Žádné komentáře